DIS-TRAN Take2: How to Calculate the Anchor Bolt Embedment of Transmission Poles

It's been a while, but we are still at it...  That's hopefully creating useful tips that make your job easier.

AnchorBolt

We have had a sort of series of Take2s referencing Anchor Bolts.  For this edition, we will look at calculating the embedment of steel transmission structures.  Please feel free to go back and view the two previous Take2 Blog posts.

     Anchor Bolt Loads
     Anchor Bolt Design

What you will hear about...

  1. What to consider when calculating the embedment.
  2. What resources to use.
  3. A working example
  4. Additional information to consider

 

   

 

Thank you for viewing the DIS-TRAN Take2. We look forward to your feedback.  Please leave any comments or questions you may have about transmission pole or anchor bolt design below.

Until next time...

New Call-to-action

 

Our Recent Posts

The Rising Demand for 765kV Substations: Powering the Next Generation of the Grid

Explore how manufacturers like DIS-TRAN Steel are advancing grid resilience by engineering steel...

Heat Safety In The Utility Industry

As temperatures rise, ensuring heat safety in the utility industry becomes paramount for DIS-TRAN...

How Ultrasonic Testing Ensures Quality of Steel Structures

In manufacturing, quality control is a top priority, especially when it comes to structural...